Hi all,
Iām new to PagerDuty and have a basic question and I havenāt been able to find a good answer. We have a legacy, on-premise ETL tool (Informatica PowerCenter) that runs a set of nightly load jobs to our data warehouse. For simplicity, letās say that I have 4 āgatesā that I expect to complete at specific times in the evening. For example, if gate2 doesnāt happen by 10:30pm EDT, I know I have a problem and would like to be alerted.
Is it possible to set up an incident to be triggered in PD based on an event NOT received by a certain time rather than triggered by an event received?
The only timeout based logic Iām finding pertains to escalations after an incident is triggered and Iām interested in triggering the incident itself based on a timeout scenario.
Thanks,